Road Construction – Fourth Street between College and Line Street

The City of Hollister is currently in the process of installing a 36″ storm drain line and a 12″ water line on Fourth Street. In addition, there will be new curb, gutter, sidewalk, driveway approaches and handicap ramps on Fourth Street. Fourth Street will be repaved and a lighted crosswalk will be placed on Fourth at Line Street.

College Street (between Fourth and Fifth Street) will receive a larger 24″ storm drain line and new curb inlets along with new ramps at the corner of Fifth and College Street.

Powell Street (between Sixth and Seventh Street) will receive a 24″ storm drain line and new curb inlets along with new ramps at the corners of Sixth and Powell Street.

Please slow down and use caution when driving thru any construction area.

The projected will be completed in October 2018. Fourth Street will remain closed periodically until the project is complete.

Please contact the City of Hollister Engineering Office at (831) 636-4340 x17 if you have any questions, comments, or complaints.

Fourth Street Infrastructure Completion Schedule (PDF File 122KB)

Posted in City Announcement.